(240)-343-2585

A preliminary vulnerability risk assessment is necessary for that it will highlight the potential weaknesses in the storage of the dynamite explosives in the magazine as well as the transportation of the explosives between the magazine and blasting sites. In so doing, it will be possible to identify two critical things. one, that TCL is within the safety, risk, and environmental legislations of Hong Kong, and more importantly, the ways through which potential weaknesses threaten the mega project can be neutralized. In doing this, the preliminary vulnerability assessment will analyze the magazine (storage), road and tunnel (transport), and blasting sites since they make up the threat environment within which the explosives will operate. From the assessment, it will be possible to reveal potential threat channels and in it acquire openness that will enable us to devise safety and precautionary measures to ensure the success of our mega project. This stage is necessary since it determines the approval or denial of the project proposal by the Hong Kong construction and explosives authorities.&nbsp. &nbsp.